Lucies Farm Photo Gallery

Home of Scottish | Kobe Beef, Kurobuta Pork, and Pampered Dogs


Home :: Contact :: Register :: Login
Album list :: Last uploads :: Last comments :: Most viewed :: Top rated :: My Favorites :: By date :: Search
Choose your language:

Last additions
jan_26_08b-0024.jpg
The "repaired" clay at Maggot's Croft413 viewsIn the second paddock. The construction of the hard core made quite a mess, but the construction team made quite an effort to smooth out the clay. It looks a bit like a lava flow in Hawaii.Jan 26, 2008
jan_26_08b-0022.jpg
Pig arcs on the new hard core467 viewsThe hard core has not yet been compacted. The clay (on the right of the photograph) has been "repaired" by the construction team, but it won't take long for the wild boar to add their own special touch.Jan 26, 2008
jan_26_08b-0021.jpg
Straw ready for the wild boars' bedding492 viewsThe wild boar are temporarily in the third paddock. When the hard core has been compacted, we will move the remaining two pig arcs and then give them all a fresh bed of straw.Jan 26, 2008
jan_26_08b-0018.jpg
The hard standing beneath the pig arcs562 viewsNot yet compacted with the roller --- a task for Monday.Jan 26, 2008
jan_26_08b-0019.jpg
The path into the pig arcs549 viewsThe pig arcs are located on the upper part of the field, so the water should drain away. The hard core will be compacted on Monday.Jan 26, 2008
jan_26_08b-0016.jpg
One of the two deep ruts415 viewsThis is one of the two deep ruts made by the construction equipment going back and forth into the second paddock, bringing hard core and scalpings for the "floor" of the wild boar pig arcs.Jan 26, 2008
jan_26_08b-0017.jpg
Almost a mini-canal423 viewsAs the ground is clay, we could almost use this groove (made by the construction equpment) as a small stream to take water to the pigs.Jan 26, 2008
jan_26_08b-0014.jpg
It will take some time to smooth this out326 viewsMud (clay) in the first paddock at Maggot's Croft, as they work on building the hard standing for the wild boar pig arcs.Jan 26, 2008
jan_26_08b-0013.jpg
A Work In Progress472 viewsIn the first paddock at Maggot's Croft. The path that's being built is straight ahead. The large groove on the right was made by the construction equipment going back and forth through the paddock.Jan 26, 2008
jan_26_08b-0012.jpg
The Path to the Pig Arcs430 viewsThe hard core has been put beneath the pig arcs (in the distance) but needs to be compacted on Monday. The last part to be finished is the hard core road from the stable yard (where this was photographed) to the pig arcs.Jan 26, 2008
jan_26_08b-0011.jpg
Pile of Scalpings and Hard Core315 viewsA day of rest. Constructing a solid path to the wild boar field, and putting a dry (drained) hard standing beneath the pig arcs.Jan 26, 2008
jan_26_08b-0008.jpg
The Feed Storage Area556 viewsIt was so nice to see sunlight --- it was even streaming into the feed storage area. That's our electric paddle boat in the back.Jan 26, 2008
14849 files on 1238 page(s) 264